521av在线网站,激情小说qvod,久久综合九色综合欧美婷婷,天天西西大胆人体影视网,亚洲精品中文字幕麻豆,成本人妻片无码中文字幕免费

首頁
產(chǎn)品
卓越 ? 易用 ? 可靠
視頻
讓中國物聯(lián)網(wǎng)領(lǐng)先世界
搜索
歷史搜索
搜索發(fā)現(xiàn)
HOME > SERVICE > Problem

AC0606 voltage and current calibration

2022-06-11 15:49:35| Source:網(wǎng)絡(luò)| views:| 0

1. The power supply of the equipment is normal, the measured current passes through the transformer coil, and the municipal power is connected to the voltage acquisition port. 

2. The current is preferably about 80% of the measuring range of the transformer coil, and the load to be measured can also be used for calibration. 

3. After the equipment communication is connected, open the modbus poll project for calibration.

  

modbus poll工程進(jìn)行校準(zhǔn)


  

modbus poll工程進(jìn)行校準(zhǔn) 數(shù)據(jù)顯示

4. Use the instrument to measure the voltage of the voltage acquisition port and the current through the transformer, and fill in the [standard source] project. 

4. After filling in the standard source, wait for 5S after filling in the calibration mode [171], observe whether the values of each voltage, current and power channel are correct, and if correct, the calibration is completed.

修改后觀察電流、電壓、頻率等內(nèi)容

5. After the equipment is powered on again, adjust the current to observe the linearity of the equipment, if the power factor is less than 0.5 or negative reverse connection transformer.


聯(lián)系銷售
銷售王經(jīng)理微信 銷售王經(jīng)理
微信公眾號 微信公眾號
服務(wù)熱線
400-6688-400
公安县| 北海市| 健康| 兴宁市| 岳普湖县| 安阳市| 平顺县| 桃园县| 利川市| 周至县| 太谷县| 汝州市| 大渡口区| 墨竹工卡县| 清流县| 昌江| 河池市| 马鞍山市|